King's College School Square Renovation

August 2021

In August we renovated King's College School cricket square. The existing surface was removed cultivated and laser levelled. Loam was spread and levelled in layers then keyed in with a Graden. Final preparations before seed and fertiliser were carried out with a pedestrian rotor rake and hand rakes. The fertiliser was spread and Limagrain MM50 cricket-wicket grass seed sown before being hand raked in.

Client Projects