East Molesey Cricket Club appointed Fineturf to carry out cricket square reconstruction ahead of the 2027 season. The project involved removing the existing growing medium and rebuilding the wicket profile with 150mm of Ongar Cricket Loam, creating a consistent and true playing surface.
Work began with the surface removal of 150mm of the existing growing medium to establish the required levels. The formation was then laser graded to achieve a true and consistent profile before being keyed and compacted in preparation for the new loam.
A 150mm layer of Ongar Cricket Loam was supplied and delivered to site before being received, keyed in and compacted in 30mm layers to build up the new wicket profile. The surface was then laser graded to achieve the required levels.
The wicket was subsequently Graden scarified before the team carried out the final ground preparation works. A combination of 28.3.15, 11.11.5 and 6.5.18 fertilisers was applied at 35g/m², followed by MM50 Amenity Grass Seed at 70g/m².
The works were completed with a final hand rake, leaving the wicket prepared for the season ahead and the site clean and tidy.