Gloucester Rugby Club 2016 End of Season Renovation

Completed in
Share

Fineturf have now completed the end of season renovation for Gloucester rugby club, for the fourth year running. This years renovation was a little later than usual due to two concerts the stadium hosted in June.

The existing surface was sprayed with glyphosate prior to our arrival when it was then fully stripped using a GKB. All arisings were vacuumed leaving clean surface. The pitch was aerated using 25mm tines. 90 tonnes of rootzone was spread over the surface. Limagrain MM60 was applied and Headland 12:12:12 fertiliser. Last years work can be viewed by clicking here 2015 renovation.

Share

Project Specification

Completed
Machinery Koro Field Top Maker, Trilo Vacuum, Wiedenmann Terra Spike, Sand Spreader, Vredo Disc Seeder
Materials 12:12:12 Fertiliser, Limagrain MM60 Seed