email | info@fine-turf.co.uktel | 01400 251605

Golf Tee Construction

Fineturf were awarded the prestigous contract of constructing a new tee at The London Golf Club. Work commenced on 26th February 2009 and was completed on 6th March 2009.

The initial phase of the project involved the removal of the old surface followed by the excavation of a drainage trench. With the drainage pipe in place and the trench backfilled rootzone was applied. The tee banks were shaped with Volvo 360 diggers and the final surface was accurately levelled with Blec Laser Graders. Big roll turf installtion was carefully carried out with tim machines.

European PGA Golf Tee Construction
email | info@fine-turf.co.uktel | 01400 251605